Sunday, 27 January 2013

Description and critical environmental evaluation of the REE refining plant LAMP near Kuantan/Malaysia

Presentation of the main results of the report prepared on behalf of SMSL
Presented at the press conference
Kuantan/Darmstadt, 26.01.2013


1 comment:

  1. How can an objective report be produced without any input from Lynas?

    Additionally Lynas will be operating to the conditions of the TOL and has already implemented additional safety measures.

    The scientific methodology used is very questionable, inaccurate and biased towards the goals of SMSL which is to resort to fact distortion.

    As this report is not objective and has not included any Lynas site visits it hardy rates with any credibility and belongs in a waste bin.

    ReplyDelete